GEPCO Solar Net Metering Guide & Rates (2026)
Learn how to sell excess solar electricity back to the GEPCO grid using bi-directional green meters under NEPRA Net Metering Regulations.
Eligibility Criteria for Solar Net Metering
- 3-Phase Connection: Net metering requires a 3-phase electricity connection.
- Sanctioned Load Capacity: Solar inverter capacity must not exceed your sanctioned load.
- AEDB Licensed Installer: Equipment must be installed by a Category C licensed vendor.
Required Documents Checklist
- Attested copy of CNIC of the connection owner.
- Copy of latest paid GEPCO bill verified via our Online Bill Checker.
- AEDB licensed solar installer installation certificate and single-line diagram (SLD).
- Technical datasheets of solar panels and grid-tied inverter.