GEPCO Solar Net Metering Guide & Rates (2026)

Learn how to sell excess solar electricity back to the GEPCO grid using bi-directional green meters under NEPRA Net Metering Regulations.

Eligibility Criteria for Solar Net Metering

  • 3-Phase Connection: Net metering requires a 3-phase electricity connection.
  • Sanctioned Load Capacity: Solar inverter capacity must not exceed your sanctioned load.
  • AEDB Licensed Installer: Equipment must be installed by a Category C licensed vendor.

Required Documents Checklist

  1. Attested copy of CNIC of the connection owner.
  2. Copy of latest paid GEPCO bill verified via our Online Bill Checker.
  3. AEDB licensed solar installer installation certificate and single-line diagram (SLD).
  4. Technical datasheets of solar panels and grid-tied inverter.
🧮 Estimate Solar Savings with Bill Calculator →